How to Install an EV Charger at Home

Featured Image

An EV charger must be installed by a licensed electrician. Installation includes a site evaluation, switchboard assessment, cable routing and mounting of the EV charger. EVSE offers professional installation for all Ocular chargers nationwide.

  • Licensed electrician required.
  • Site inspection recommended.
  • Must follow AS3000 wiring rules.
  • Suitable for indoor and outdoor mounting.

Step by Step Installation Process

  • Step 1: Site assessment. The electrician checks switchboard capacity and plans cable route.
  • Step 2: Switchboard testing. Circuit breakers and RCD protection are verified.
  • Step 3: Mounting the charger. The Ocular unit is fixed to the wall.
  • Step 4: Cable connection. Wiring is run to the charger location.
  • Step 5: Testing. The electrician tests load, safety and charger operation.

Recommended Chargers

  • Ocular LTE Plus: Simple monitoring functions through a Bluetooth app.
  • Ocular IQ Home Solar: Supports more advanced scheduled charging with OCPP app.
  • Ocular IQ Home Solar 22 kW: Ideal for three phase setups with monitoring options.

Installation Considerations

  • Distance between charger and switchboard.
  • Indoor or outdoor mounting.
  • Cable routing through walls or ceiling.
  • Single or three phase configuration.

Frequently Asked Questions

Can I install the charger myself?

No.

Do I need a site inspection?

Recommended.

Is three phase required?

Only for 11-22 kW output, you can still charge overnight with single phase installations.

Does the installation include cabling?

Yes within standard limits.

Install your EV charger with confidence – get a tailored quote today. 

Author

Share this Article

OCPP: 4 letters to remember when investing in EV charging stations

What is OCPP? The Open Charge Point Protocol (OCPP) is an open-source communication protocol for networked electric vehicle chargers. It can be considered a syntax language in which EV chargers are able to communicate between electric vehicle charging points and central control systems. As an open-source protocol, anyone can access and contribute to it. OCPP […]
Read More

Net Zero Plan Stage 1: How the deployment of fast charging infrastructure will reduce global warming

Carbon dioxide emitted from vehicles has been identified by the NSW government as the second biggest contributor to climate change. Renewable electricity generation strategies are the leading priority for the NSW Government as the graph above highlights due to its greenhouse gas emission. Transport is highlighted as the 2nd highest contributor with the government looking […]
Read More

Find the right charger

Tell us about your car and home to see recommendations.

Get the best price

Stocking the best Electric Car products from the World’s leading brands.

Reliability

All of our EVSE products are compliant with Australian & International standards.